Five phases, whether it is a substation or a software rollout.

Durations below are typical, not promises. The schedule is set by the longest-lead item, and we name that item in phase one rather than discovering it in phase four.

01

Discovery & feasibility

Week 1–2

We establish what is actually true: available capacity and its cost, site facts, budget and schedule reality — or, on the technology side, an inventory of the systems and data you already have and who touches them. This phase exists to kill bad projects cheaply. If the capacity is not there or the economics do not close, you hear it here.

Out of this phase
  • Feasibility memo, go / no-go
  • Named longest-lead item
  • Order-of-magnitude budget
  • Risk register
02

Definition & design

Week 2–6

One-lines, equipment specifications and a construction scope somebody can bid against — or solution architecture, a ranked use-case register and an integration map. Everything is written down, because a specification held in someone's head cannot be reviewed, quoted against, or handed to a contractor.

Out of this phase
  • One-line and equipment schedule
  • Written specifications
  • Scope of work for bidding
  • Solution architecture
03

Procurement & selection

Week 4–12

RFQs go to vendors who can actually build the thing. Bids are leveled on a like-for-like basis so you are comparing the same scope, not the same number. Long-lead items are released first — usually before design is finished, which is deliberate and explained below.

Out of this phase
  • Bid tabulation
  • Award recommendation
  • Purchase orders released
  • Delivery schedule
04

Deployment & construction

Week 8–30

Contractor and vendor oversight, submittal and drawing review, factory test witness — or configuration, data migration and a live pilot with real users. This is the longest phase and the one where absent oversight costs the most, because every substitution and every missed submittal gets discovered at the end instead of the middle.

Out of this phase
  • Reviewed submittals
  • Factory test reports
  • Site progress reports
  • Migrated data, pilot results
05

Commissioning & handover

Week 2–4

Energization or go-live against a checklist somebody signs. As-built documentation, operator and staff training, and a written support plan naming who to call for what. A project is not finished when it works; it is finished when the people who own it can run it without us.

Out of this phase
  • Signed commissioning checklist
  • As-built documentation
  • Training delivered
  • Written support plan
Why the phases overlap

The transformer sets the date, not the crew

Procurement of the main power transformer starts before design is finished. That looks reckless until you plot it: the equipment is in the factory for most of the project, and every week you wait to release it is a week added to energization.

W0 W4 W8 W12 W16 W20 W24 W28 W32 W36 01  Discovery & feasibility 02  Definition & design 03  Procurement & selection 04  Deployment & construction 05  Commissioning & handover Main transformer Manufacture, factory test and delivery — released in week 6

Release the transformer in week 6 and it arrives with a month to spare. Release it when construction drawings are complete in week 16 and the same unit lands after the crew has demobilized — the site sits finished and dark, waiting on one piece of steel and copper.

Medium-voltage switchgear assembly on a shop floor before shipment
Phase four — witnessing the build before it ships
What we need from you

Three things, or the schedule slips

01

One decision-maker

Someone who can approve an award and mean it. Committee procurement is how a forty-week lead time becomes fifty.

02

Access to the facts

Utility correspondence, site surveys, existing drawings, your actual invoices and inventory — including the parts that are embarrassing.

03

A week-one release

Authority to start the long-lead item as soon as the one-line is fixed, rather than after the last drawing is stamped.

Start with phase one.

Two weeks, a written memo, and an honest answer about whether the rest is worth doing.

Request a consult
CornRex Technology
Company Home About Process
Services Power practice Technology practice Contact
Contact 2524 N Broadway Edmond, Oklahoma 73034 info@cornrextech.com
© 2026 CornRex Technology LLC